My GT is scheduled to be built tomorrow, Aug 15. Checked the the status and shows still in production. Now there is a window sticker. Has all the features except it is showing lift gate delete -55. Does this mean no hands free lift gate?

Yes that feature was taken off in order to expedite your build.My GT is scheduled to be built tomorrow, Aug 15. Checked the the status and shows still in production. Now there is a window sticker. Has all the features except it is showing lift gate delete -55. Does this mean no hands free lift gate?
Just wondering...If the 23's will have those "deleted features". Will the chips needed magically appear for the 2023 models? Those features could just not be included as a standard or optional feature.L...
Since I ordered in Feb and the build date is Sept 19th (supposedly), which is after the date to order a 2023 model, I would have some serious soul-searching if items are deleted.
Well, there's a chance it was pushed. Since the 15th was a Monday and the beginning of the week, its Likely you had a build WEEK asigned and not a build day. If you have a window sticker available , maybe share it here and there should be a build DAY on there, if you don't have a window sticker available yet, its probable that you have been shifted to another build week later down the road. Hope that helps.How often is the order tracking site updated? My GT was scheduled for projection August 15, but the web site still shows (1) order confirmed. Is there a delay in production and that is the reason why the tracking has not moved from (1) order confirmed.
The very top of the sticker there should be a box that says BLEND with a series of numbers, the last 6 has the Date it is to be built.I do have a window sticker and would the build date be on it? If so, where is the date located?
View attachment 14546 Would the build date tomorrow?
I understand the semantics involved here and can see where it can get confusing. There is no official build date, as you may know. There is a production date. That can only be found thru Lincoln's Vehicle Visibility report and the process of BUILT it a series of smaller processes. The simplest way to find out when that process starts, is via the blend date. Here are the series of steps for inquiring minds and for all the same and similar question posters.Hi Tim. This type of question has been answered many times before...So just to avoid confusion for others wondering about the same or similar questions: That is not the Build date. Build dates are not on the window sticker.
Good luck.
Checked the web site this morning and looks like my GT is in production.
Just curious, is the plant a M-F 08:00 -17:00 operation or is it a 24 hour and weekends running!
Louisville Assembly used to be a 3 shift 24/7 operation. Last year, prior to the launch of the 2022 Lincoln Navigator, a shift was dropped at Louisville Assembly and full time workers were transferred to Kentucky Truck (also in Louisville). The current model of the Ford Escape, which is the primary vehicle built at LAP, isn't a hot seller. In addition, the chip shortages continue to plague the automotive sector across the board. While the shortages seem to have somewhat improved, some CEOs keep saying the shortages are almost over. The actuality is the shortages will continue well into 2023. During 2023, there will be several new fabs coming on board to make chips. These ramp ups are slow but by the end of 2023 things should be normalized.Hi Jasper. First...even in good times, for a high demand vehicle model, most automotive assembly lines would run two shifts maximum.
Currently, considering the parts and commodity shortages, it is doubtful any automotive assembly line is running at full capacity.
While I do not know the precise Corsair assembly line schedule, it is most certainly far shorter than any pre-pandemic one.
Who knows, perhaps we have a member who works on the Louisville KY assembly line, and can give us more answers?
Good luck.