angore
Well-known member
- Joined
- Apr 3, 2024
- Messages
- 1,954
- Reaction score
- 952
- Points
- 113
- Location
- Triangle area. North Carolina
- My Lincoln
- 2024 Nautilus Premier Hybrid (Sheila)
The CSP notice does give the build date range - 7 Oct 23 to 28 Feb 24. I suspect the entire production of hybrids is affected and would require a list of 6000+ VINs. At my former employer, the sequence of the product was unique 1000, 1001. etc but the sequence was shared so say a hybrid could be 1001,1003, 1007, 15, etc., The sequence was not always 100% chronological in terms of build. It is easier to track build dates since tied to when parts at an engineering change level are used or a mfg process change.
If the Lincoln party line is keep driving, one may think the failure rate is fairly low between now and when parts are available. They will never say how many have failed (poor engine performance) vs total engine loss (most what is reported here) or how many they expect to fail. Even if it is just the injector, it will sit idle until new parts or will they put in existing parts and say keep driving.
If the Lincoln party line is keep driving, one may think the failure rate is fairly low between now and when parts are available. They will never say how many have failed (poor engine performance) vs total engine loss (most what is reported here) or how many they expect to fail. Even if it is just the injector, it will sit idle until new parts or will they put in existing parts and say keep driving.
Last edited: