Has anyone had their production date start on Nov 6 but take until Nov 18 to finish the build? It didn't have the recall (built post recall issue) and I don't think there were any items that should have taken extra time, especially since everything was stockpiled while the Chicago plant was on strike?
Order date: July 18, 2023 (in midst of recall, ordered vs wait for one in stock due to features I wanted)
1st Window Sticker: mid-September
Blend Date: Sept 29, 2023 (the day the Chicago plant went on strike)
New Window Sticker: Oct 28, all different numbers, invoice date, and is now classified as a re-bill - but the blend date stayed the same (first day Chicago was back at work following the strike)
Production Start: Nov 6, 2023
Built Date: Nov 18, 2023
Ordered with the following:
- Equipment group 201A
- Jet pkg
- Tow pkg
- Illumination pkg
- Full rear console
- Hands-free liftgate delete
- Roast interior/black exterior
Also, does anyone know the current wait time to ship to Calgary area in Alberta, Canada? And current shipping time once it's shipped? Ironically we're heading East in what I think will be the same time it's arriving here.